Daywork cost calculator
Total the labour, material and plant used for a daywork record.
Your working result
Assumptions and calculation guidance
Worked example and related working sheet
How to Use This Calculator
For each labour line, enter the number of people, hours per person and hourly rate. Add the material and plant costs and the agreed additions. Use the separate overhead and profit field only where that addition applies. Keep the daily record and supporting costs on the same basis.
Worked Example
Two people working eight hours at £25 per hour produce £400 of labour. Materials of £100 and plant of £50, each with a 10% uplift, bring the subtotal to £565. A further 10% overhead and profit allowance gives £621.50.
Before You Use the Result
Check the agreed daywork rates and additions before using the total. Retain signed sheets, times, delivery tickets and plant records, and avoid recovering the same allowance twice.
For a project that needs a wider review, explore QSEC variation and final-account support alongside The Subbie QS support.
Return to the full QS tools library for related calculators. You can also read about our estimating and cost support or use the free QS templates to organise the underlying records.
Use The Working Sheet For This Task
Record extra work, labour, materials, plant and supporting references while the facts are fresh.
Download the Daywork & Site Record Sheet (Excel)
Each Excel link takes you to the matching sheet preview. Enter your work email to download, replace the example entries and start using the file on your job. Marketing is optional.